Maximizing Storage Asset Value
SINEXCEL supplied 200 MW of power conversion capacity through 120 customized 1725 kW PCS units, helping ensure reliable and efficient system operation.

In Inner Mongolia, North China's first large-scale building-integrated Battery Energy Storage System (BESS) has entered commercial operation, establishing a new benchmark for utility-scale energy storage deployment.

 

The 300 MW/600 MWh storage facility is connected to a 2 GW wind power base and supports renewable energy integration, grid stability, and the transmission of clean electricity to Beijing, Tianjin, and Hebei. SINEXCEL supplied 200 MW of power conversion capacity through 120 customized 1725 kW PCS units, helping ensure reliable and efficient system operation.

 

More than a large-scale storage project, the facility represents a new approach to BESS deployment. Its success depended not only on system capacity, but also on customized engineering, environmental resilience, cross-functional coordination, and rapid project execution.

 

Far exceeding a simple capacity expansion, this installation redefines how energy storage systems are deployed. Its stable operation hinges on three core innovations: robust environmental protection, anti-accumulation architecture, and optimized long-duration energy management

 

 

The Challenge: Engineering Beyond Conventional BESS

The project tested not only an innovative storage architecture, but also SINEXCEL's ability to translate complex engineering requirements into predictable project outcomes.

 

1. Architectural Shift: The Building-Integrated Challenge

Unlike conventional containerized BESS projects, this facility adopted a building-integrated architecture supported by centralized thermal management.

The design introduced new requirements for PCS installation, electrical connection, heat dissipation, and overall system integration. A customized solution was therefore needed to ensure that the PCS could be safely and efficiently integrated into the building-based energy storage system.

 

2. Extreme Climate: Navigating 72.6°C Temperature Swings

Inner Mongolia experiences severe winters, frequent sand and dust, heavy snow, and an annual temperature range of up to 72.6°C.

These conditions placed stringent requirements on enclosure protection, low-temperature performance, environmental adaptability, and long-term equipment reliability.

 

3. Race Against Time: Delivering Under Extreme Pressure

To meet the project's safety and integration requirements, all busbar connections had to be completed on-site.

Combined with a two-month schedule covering installation, commissioning, system tuning, and grid connection, the project required close coordination among engineering, procurement, delivery, service, and EPC teams.

 

Turning Engineering Challenges into Reliable Performance

To meet the project's specific requirements, SINEXCEL customized 120 units of 1725 kW PCS and optimized both product design and system integration.

The solution addressed three priorities: integration with the building-based architecture, reliable operation under extreme environmental conditions, and rapid delivery under a highly compressed schedule.

 

1. Customized Integration for a Building-Integrated BESS

SINEXCEL developed an IP68-rated direct busbar connection solution specifically for the project's building-integrated architecture.

Compared with conventional cable or copper-bar connection methods, the customized design:

  • Reduces the risk of localized overheating caused by inconsistent cable resistance

  • Provides a higher level of connection protection

  • Improves installation flexibility

  • Supports reliable high-power integration within the building-based storage system

Together with the facility's centralized thermal management system, the PCS solution helped reduce auxiliary power consumption by approximately 75%. This improves overall system efficiency while lowering long-term operating costs.

2. Designed for Extreme Environments

Reliable operation throughout Inner Mongolia's demanding climate was another critical requirement.

Featuring a NEMA 3R enclosure and robust environmental protection, the PCS is designed to maintain stable performance under conditions including:

  • Seasonal temperature variations of up to 72.6°C

  • Sandstorms and high levels of airborne dust

  • Snow accumulation of up to 500 mm

This environmental adaptability supports long-term operational reliability while helping reduce maintenance requirements throughout the system lifecycle.

3. Rapid Execution Under a Tight Schedule

When busbar delivery delays placed additional pressure on the project schedule, SINEXCEL quickly mobilized its R&D, procurement, project delivery, and service teams.

Working closely with the EPC contractor, the teams completed the necessary on-site adaptations, system commissioning, and performance verification without compromising the planned grid-connection schedule.

The project demonstrated how rapid coordination and engineering flexibility can prevent unexpected site conditions from becoming long-term delivery risks.

 

Responsive Service, Higher Asset Availability

Reliable equipment is only one part of long-term storage asset performance. Fast and effective technical support is equally important when operational issues arise.

Through a combination of remote diagnostics and on-site technical support, SINEXCEL resolved an operational issue at the project site in less than 2 hours, helping minimize downtime and maintain high system availability.

This response capability is supported by SINEXCEL's global service infrastructure, which includes 10+ service centers across Europe, North America, and the Asia-Pacific region.

Through local technical teams, tiered service mechanisms, and clearly defined response procedures, SINEXCEL provides support tailored to different project configurations and operating environments.

 

Delivering Measurable Value

Since entering full commercial operation in November 2023, the project has continued to generate tangible environmental, operational, and financial value:

  • Approximately 6.5 TWh of clean electricity transmitted annually

  • Approximately 3.53 million €3.1 million) in annual project revenue

These results demonstrate how carefully engineered power conversion solutions can contribute not only to successful project delivery, but also to the long-term performance and commercial value of energy storage assets.

A Step Toward Smarter Utility-Scale Energy Storage

This project highlights SINEXCEL's ability to deliver more than high-efficiency PCS products.

Through tailored engineering, strong environmental adaptability, responsive service, and efficient execution, SINEXCEL helps utilities, developers, and EPC partners reduce integration risks, enhance system reliability, and maximize long-term asset value.

With over 17 GW of installed energy storage capacity and more than 5,000 deployments across 60+ countries and regions, SINEXCEL continues to support the next generation of utility-scale energy storage with proven, reliable solutions.

Deployment
2023.11
Capacity
200MW/400MWh
Product
120*customized 1725 kW PCS
エネルギーの自由を実現する
シンプルかつ柔軟な仕組みで、安定したエネルギー利用を支えます。
お問い合わせ
  • ご関心のあるソリューション・製品*
  • SINEXCELをどこでお知りになりましたか?*
  • 「プライバシーポリシー」を読み、同意します。

    盛弘が業務上の連絡および社外とのコミュニケーションに使用するメールアドレスは、@sinexcel.com、@sinexcel.cn、@global.sinexcel.com のいずれかで終わるものに限ります。これら以外のドメインを使用するメールアドレスは、盛弘が正式に認めたものではありません。不測の損失を避けるため、送信元のメールアドレスを十分にご確認ください。
  • 名前を入力してください
    閉める
    送信成功
    証券コード
    300693.SZ
    シンエクセル・ジャパン株式会社 〒160-0023 東京都新宿区西新宿7-20-1
    SINEXCELグローバル本社 〒518000 中国広東省深圳市南山区松白路1002号
    brand@sinexcel.com
    400-0055-776-1
    Copyright © 2026 SINEXCEL All Rights Reserved BY: Niegoweb プライバシーポリシー | 重要事項
    0755-8651-1588 sales@sinexcel.com